Safe Routes To School : progress in implementing the program, but a comprehensive plan to eveluate program outcomes is needed : report to the Ranking Member, Committee on Environment and Public Works, U.S. Senate.

Author/creator United States
Other author United States. Congress. Senate. Committee on Environment and Public Works.
Format Electronic
Publication Info[Washington, D.C.] : U.S. Govt. Accountability Office, [2008]
Descriptionii, 41 p. : digital, PDF file
Supplemental Contenthttps://purl.fdlp.gov/GPO/LPS99990
Subjects

Portion of title Progress in implementing the program, but a comprehensive plan to eveluate program outcomes is needed
General noteTitle from title screen (viewed on Aug. 14, 2008).
General note"July 2008."
General notePaper version available from: U.S. Govt. Accountability Office, 441 G St., NW, Rm. LM, Washington, D.C. 20548.
General note"GAO-08-789."
General noteGPO Cataloging Record Distribution Program (CRDP).
Bibliography noteIncludes bibliographical references.
Technical detailsMode of access: Internet from GAO web site. Address as of 8/14/08: http://www.gao.gov/new.items/d08789.pdf; current access available via PURL.
Technical rpt numberGAO-08-789
GPO item number0546-D (online)
Govt. docs number GA 1.13:GAO-08-789
Stock numberGAO (202)512-6000 (voice); (202)512-6061 (Fax); (202)512-2537 (TDD) paper copy

Availability

Library Location Call Number Status Item Actions
Electronic Resources Access Content Online ✔ Available