Upgrades to the closed bomb facility and measurement of propellant burning rate / Tyler Wagner, John Ritter, and Barrie E. Homan.

Author/creator Wagner, Tyler
Other author Ritter, John.
Other author Homan, Barrie E.
Other author U.S. Army Research Laboratory.
Format Electronic
Publication InfoAberdeen Proving Ground, MD : U.S. Army Research Laboratory, [2010]
Description1 online resource (vi, 29 pages) : illustrations.
Supplemental Contenthttps://purl.fdlp.gov/GPO/LPS121179
Subjects

SeriesARL-TR ; 5058
ARL-TR (Aberdeen Proving Ground, Md.) ; 5058. UNAUTHORIZED
Abstract Propellants are a class of materials designed to produce low molecular weight gases that can be used in guns, missiles, and pyrotechnics. The burn rate of a propellant is used to design such munitions systems. The preferred method for obtaining the burn rate is the constant volume closed bomb. The pressure-time history obtained in closed bomb experiments, coupled with a propellant's thermochemistry and geometry, is used to calculate the linear burn rate. The hardware and software previously used to record the data needed to calculate the linear burn rate were outdated. The software that controlled the closed bomb experiments required modification in order to integrate the command set of the new Agilent oscilloscope. The new program sends user-defined commands, reads data from an external voltage source, and arranges that data in the proper format for XLCB, the burn rate data reduction code written in house using Visual BASIC in Microsoft Excel. The new code improves efficiency by creating buffers, eliminating extraneous subroutines. The new software has been tested for accuracy against the previous program using a split signal and closed bomb tests. This report presents a brief overview of closed bomb testing, a detailed account of the program and programming process, and results confirming the accuracy of the new program.
General noteTitle from title screen (viewed March 31, 2010).
General note"January 2010."
Bibliography noteIncludes bibliographical references (p. 12).
Access restrictionAPPROVED FOR PUBLIC RELEASE.
Report noteFinal; June-July 2009.
Issued in other formPrint version: Wagner, Tyler. Upgrades to the closed bomb facility and measurement of propellant burning rate. vi, 29 p.
GPO item number0324-A-01 (online)
Govt. docs number D 101.133:5058

Availability

Library Location Call Number Status Item Actions
Electronic Resources Access Content Online ✔ Available