Savannah Harbor, Ga. : letter from the Secretary of the Army transmitting a letter from the Chief of Engineers, United States Army, dated June 6, 1952, submitting a report ... on a review of reports on Savannah Harbor, Georgia, with a view to determining if it is advisable to modify the existing project in any way at this time, particularly to providing a turning basin above Seaboard Air Line Railroad Bridge, requested by a resolution of the Committee on Public Works, House of Representatives, adopted on April 25, 1951.

Author/creator United States
Format Book
Publication InfoWashington, D.C. : U.S. Dept. of the Army, 1953.
Description28 pages : 1 folded map ; 24 cm
Subjects

General noteCover title.
General note"March 23, 1953.-Referred to the Committee on Public Works and ordered to be printed with one illustration"--Cover.
General note"31171-53-1"--Cover.
General noteAt head of title : House of Representatives, 83rd Congress, 1st session, Document No. 110.
Govt. docs number D 103.22:SA 9

Availability

Library Location Call Number Status Item Actions
Joyner Fed Docs Stacks D 103.22:SA 9 ✔ Available Place Hold