The system integration and verification testing of an orbital maneuvering vehicle for an air bearing floor : final report / prepared by Nicholas L. Shields, Jr. [and others].

Other author Shields, Nicholas L.
Other author Essex Corporation. Space Systems Group.
Other author Teleoperator and Robotics Evaluation Facility (George C. Marshall Space Flight Center)
Format Electronic
Publication InfoHuntsville, Ala. : Essex Corporation, Space Systems Group : Teleoperator and Robotics Evaluation Facility, Control Electronics Branch, George C. Marshall Space Flight Center, [1986]
Description1 online resource (ix, 117 pages) : illustrations.
Supplemental Contenthttps://purl.fdlp.gov/GPO/gpo25009

Series[NASA contractor report] ; 178350
NASA contractor report ; NASA CR-178350. ^A441636
General noteTitle from title screen (viewed on Aug. 16, 2012).
General note"February 22, 1986."
General note"Report no. H-86-02."
Bibliography noteIncludes bibliographical references (p. 85-117).
Report noteFinal report.
Funding informationPrepared for Teleoperator and Robotics Evaluation Facility, Control Electronics Branch, George C. Marshall Space Flight Center under contract NAS8-35636 H-86-02
Issued in other formPrint version: system integration and verification testing of an orbital maneuvering vehicle for an air bearing floor.
Issued in other formMicrofiche: system integration and verification testing of an orbital maneuvering vehicle for an air bearing floor.
GPO item number0830-H-14 (online)
Govt. docs number NAS 1.26:178350

Availability

Library Location Call Number Status Item Actions
Electronic Resources Access Content Online ✔ Available