ANA facilities at Mazar-e-Sharif and Herat generally met construction requirements, but contractor oversight should be strengthened.
| Author/creator | United States |
| Format | Electronic |
| Publication Info | Arlington, VA : Office of the Special Inspector General for Afghanistan Reconstruction, [2011] |
| Description | 1 online resource (iv, 24 p.) : col. ill. |
| Supplemental Content | https://purl.fdlp.gov/GPO/gpo27319 |
| Subjects |
| Variant title | Afghan National Army facilities at Mazar-e-Sharif and Herat generally met construction requirements, but contractor oversight should be strengthened |
| Series | SIGAR audit ; 11-9 SIGAR audit ; 11-9. UNAUTHORIZED |
| General note | Title from title screen (viewed on Aug. 23, 2012). |
| General note | "April 25, 2011." |
| General note | GPO Cataloging Record Distribution Program (CRDP). |
| Bibliography note | Includes bibliographical references. |
| GPO item number | 0876-A-38 (online) |
| Govt. docs number | S 1.163/2:11-9 |
Availability
| Library | Location | Call Number | Status | Item Actions |
|---|---|---|---|---|
| Electronic Resources | Access Content Online | ✔ Available |