Semiannual report for the period April 1, 1980, to September 30, 1980, of work on : 1) superconducting power transmission system development ; 2) cable insulation development.
| Author/creator | Brookhaven National Laboratory |
| Other author | United States. Department of Energy. |
| Format | Book |
| Publication Info | Upton, N.Y. : Dept. of Energy, Brookhaven National Laboratory, Accelerator Dept., Division of Advanced Technology Applications ; Springfield, Va. : Available from National Technical Information Service, [1980] |
| Description | iii, 98 pages : illustrations ; 28 cm |
| Subjects |
| General note | "BNL 51329." |
| General note | Contract no. DE-AC02-76CH00016. |
| General note | "Power transmission project technical note no. 110." |
| General note | "24 November 1980." |
| Bibliography note | Includes bibliographical references. |
| Technical rpt number | BNL 51329 |
| GPO item number | 429-T-4 |
| Govt. docs number | E 1.28:BNL 51329 |
Availability
| Library | Location | Call Number | Status | Item Actions |
|---|---|---|---|---|
| Joyner | Fed Docs Stacks | E 1.28:BNL 51329 | ✔ Available | Place Hold |