Water constraints in power-plant siting and operation : Wisconsin power plant impact study / by Nathaniel Tetrick, Erhard Joeres.

Author/creator Tetrick, Nathaniel
Other author Joeres, Erhard F.
Other author Environmental Research Laboratory (Duluth, Minn.)
Other author University of Wisconsin--Madison. Institute for Environmental Studies.
Format Book
Publication InfoDuluth : Environmental Research Laboratory-Duluth, Office of Research and Development, U.S. Environmental Protection Agency ; Springfield, Va. : Available to the public through the National Technical Information Service, 1980.
Descriptionx, 117 pages : illustrations, maps ; 28 cm.
Subjects

SeriesResearch reporting series. 3, Ecological research ; EPA-600/3-80-077
Research reporting series. 3, Ecological research EPA-600/3-80-077. ^A7943
General note"Institute for Environmental Studies, University of Wisconsin-Madison."
General note"This study was conducted in cooperation with Wisconsin Power and Light Company, Madison Gas and Electric Company, Wisconsin Public Service Corporation, Wisconsin Public Service Commission, and Wisconsin Department of Natural Resources."
General note"July 1980."
General note"Grant no. R803971."
Bibliography noteIncludes bibliographical references.
Other formsAlso issued online.
Issued in other formOnline version: Tetrick, Nathaniel. Water constraints in power-plant siting and operation. Duluth : Environmental Research Laboratory-Duluth, Office of Research and Development, U.S. Environmental Protection Agency ; Springfield, Va. : Available to the public through the National Technical Information Service, 1980
Technical rpt numberEPA-600/3-80-077
GPO item number431-I-11
Govt. docs number EP 1.23:600/3-80-077

Availability

Library Location Call Number Status Item Actions
Joyner Fed Docs Stacks EP 1.23:600/3-80-077 ✔ Available Place Hold