Guidelines for inservice testing at nuclear power plants : inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants, final report / prepared by Gurjendra S. Bedi.
| Author/creator | Bedi, Gurjendra S. author. |
| Other author | U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation. Division of Engineering, issuing body. |
| Format | Electronic |
| Edition | Rev. 2. |
| Publication | Washington, DC : Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, October 2013. |
| Description | 1 online resource (various pagings) |
| Supplemental Content | https://purl.fdlp.gov/GPO/gpo70684 |
| Subjects |
| Portion of title | Inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants, final report |
| General note | Title from title screen (viewed on July 29, 2016). |
| General note | "NUREG-1482, rev. 2." |
| General note | "Manuscript completed: September 2013; date published: October 2013." |
| General note | "Performing organization: Division of Engineering, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission"--Bibliographic data sheet. |
| General note | GPO Cataloging Record Distribution Program (CRDP). |
| Bibliography note | Includes bibliographical references. |
| Report note | Technical. |
| Issued in other form | Print version: Bedi, Gurjendra S. Guidelines for inservice testing at nuclear power plants |
| Technical rpt number | NUREG-1482 |
| GPO item number | 1051-H-48 (online) |
| Govt. docs number | Y 3.N 88:10/1482/REV.2/FINAL |
Availability
| Library | Location | Call Number | Status | Item Actions |
|---|---|---|---|---|
| Electronic Resources | Access Content Online | ✔ Available |