Piloted simulation study of an ILS approach of a twin-pusher business/commuter turboprop aircraft configuration / Donald R. Riley and Jay M. Brandon, Louis J. Glaab.
| Author/creator | Riley, Donald R. author. |
| Other author | Brandon, Jay M., author. |
| Other author | Glaab, Louis J., author. |
| Other author | Langley Research Center, issuing body. |
| Format | Electronic |
| Publication | Hampton, Virginia : National Aeronautics and Space Administration, Langley Research Center, January 1994. |
| Description | 1 online resource (118 pages, 1 unnumbered page) : illustrations. |
| Supplemental Content | https://purl.fdlp.gov/GPO/gpo157689 |
| Portion of title | Piloted simulation study of an instrument landing system approach of a twin-pusher business/commuter turboprop aircraft configuration |
| Series | NASA/TM ; 4516 NASA technical memorandum 4516. ^A467613 |
| General note | "January 1994." |
| General note | GPO Cataloging Record Distribution Program (CRDP). |
| Bibliography note | Includes bibliographical references (page 118). |
| Report note | Technical memorandum. |
| Funding information | NASA Langley Research Center WU 535-03-01-03 |
| Source of description | Description based on online resource, PDF version; title from title page (NASA, viewed on July 15, 2021). |
| Issued in other form | Print version: Riley, Donald R Piloted simulation study of an ILS approach of a twin-pusher business/commuter turboprop aircraft configuration |
| GPO item number | 0830-D (online) |
| Govt. docs number | NAS 1.15:4516 |
Availability
| Library | Location | Call Number | Status | Item Actions |
|---|---|---|---|---|
| Electronic Resources | Access Content Online | ✔ Available |