Stranded cost estimates for a restructured electric industry in North Carolina : final report : volume 3-task 4 : analysis of options for resolving stranded cost issues : estimates of stranded costs and recovery options / prepared by Research Triangle Institute, Center for Economics Research.

Other author North Carolina. General Assembly. Study Commission on the Future of Electric Service in North Carolina.
Other author Center for Economics Research (Research Triangle Institute)
Format Microform
Publication InfoResearch Triangle Park, NC : The Institute, [1999]
Description1 volume (various pagings) : illustrations ; 28 cm
Subjects

Portion of title Analysis of options for resolving stranded cost issues
General note"Prepared for Legislative Study Commission on the Future of Electric Service in North Carolina."
General note"August 1999."
General note"RTI Project Number 7135-042."
Bibliography noteIncludes bibliographical references.
Reproduction noteJoyner- Microfiche. Raleigh, N.C. : N.C. Division of State Library, 2000. 2 microfiches : negative ; 11 x 15 cm.
Issued in other formOriginal
Other class# Y4 E37:3/4
Stock number04400 NCTE

Availability

Library Location Call Number Status Item Actions
Joyner NC Documents Y4 E37:3/4 ✔ Available