Highway infrastructure : preliminary information on the timely completion of highway construction projects / statement of Katherine Siggerud, Acting Director, Physical Infrastructure Issues.

Portion of title Preliminary information on the timely completion of highway construction projects
SeriesTestimony ; GAO-02-1067 T
Testimony GAO-02-1067 T. ^A682308
General noteTitle from title screen (viewed on June 23, 2003).
General note"For release ... September 19, 2002."
General notePaper version available from: General Accounting Office, 441 G St., NW, Rm. LM, Washington, D.C. 20548.
Bibliography noteIncludes bibliographical references.
Technical detailsSystem requirements: Adobe Acrobat Reader.
Technical detailsMode of access: Internet from GAO web site. Address as of 06/23/03: http://www.gao.gov/new.items/d021067t.pdf; current access available via PURL.
Issued in other formHighway infrastructure : preliminary information on the timely completion of highway construction projects 16 p.
GPO item number0546-D-01 (online)
Govt. docs number GA 1.5/2:GAO-02-1067 T

Availability

Library Location Call Number Status Item Actions
Electronic Resources Access Content Online ✔ Available