Space shuttle : NASA must reduce costs further to operate within future projected funds : report to Congressional requesters / United States General Accounting Office.

Author/creator United States
Format Microform
Publication InfoWashington, D.C. (P.O. Box 37050, Washington 20013) : The Office, [1995]
Description42 p. : ill. ; 28 cm.
Supplemental Contenthttps://purl.fdlp.gov/GPO/LPS20491
Subjects

Portion of title NASA must reduce costs further to operate within future projected funds
General note"B-260706"--P. [1].
General note"GAO/NSIAD-95-118."
General note"June 1995."
General noteCover title.
General noteShipping list no.: 96-0684-M.
General noteGPO Cataloging Record Distribution Program (CRDP).
Bibliography noteIncludes bibliographical references.
Other formsAlso available via Internet from the GPO Access web site. Address as of 7/17/02: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=gao&docid=f:ns95118.pdf; current access is available via PURL.
Reproduction noteMicrofiche. [Washington, D.C.] : U.S. General Accounting Office, [1996?] 1 microfiche : negative.
Technical rpt numberB-260706
Technical rpt numberGAO/NSIAD-95-118
GPO item number0546-D (MF)
GPO item number0546-D (online)
Govt. docs number GA 1.13:NSIAD-95-118
Stock number154853 GAO (202) 512-6000 (voice); (202) 512-6061 (Fax); (202) 512-2537 (TDD) paper copy

Availability

Library Location Call Number Status Item Actions
Joyner Microforms B300 GA 1.13:NSIAD-95-118 ✔ Available