Ford Cleveland : inside-out analysis indentifies energy and cost savings opportunities at metal casting plant.
| Other author | Industrial Technologies Program (U.S.) |
| Format | Book |
| Publication Info | Washington, DC : Industrial Technologies Program, Energy Efficiency and Renewable Energy, U.S. Dept. of Energy, [2003] |
| Supplemental Content | https://purl.fdlp.gov/GPO/LPS48558 |
| Subjects |
| Variant title | At head of title: Metal casting, bestpractices plant-wide assessment case study |
| Variant title | Metal casting, best practices plant-wide assessment case study |
| General note | Title from title screen (viewed on May 5, 2004). |
| Technical details | Mode of access: Internet from the National Renewable Energy Laboratory web site. Address as of 5/5/04: http://www.nrel.gov/docs/fy03osti/33260.pdf; current access available via PURL. |
| GPO item number | 0429-A (online) |
| Govt. docs number | E 1.2:2004019534 |