Search Results
Showing 11 - 15 of 15 results
Search Results
Stranded cost estimates for a restructured electric industry in North Carolina (revised)
| Location | Call # | Status |
|---|---|---|
| Joyner - NC Documents | Y4 E37:3/4 ADD. | ✔ Available |
Estimates of the benefits and detriments of electric industry restructuring in North Carolina
| Location | Call # | Status |
|---|---|---|
| Joyner - NC Documents | Y4 E37E:1 | ✔ Available |
Estimates of the benefits and detriments of electric industry restructuring in North Carolina
| Location | Call # | Status |
|---|---|---|
| Joyner - NC Documents | Y4 E37E:2 | ✔ Available |
Electric rate study for Greenville Utilities Commission, Greenville, North Carolina
| Location | Call # | Status |
|---|---|---|
| Joyner - NC Reference | HD9685 .R82X 1981 | ✔ Available |
The Duke/CP&L plan to resolve the MPA debt problem
| Location | Call # | Status |
|---|---|---|
| Joyner - NC Documents | Y4 E37:1 2000 | ✔ Available |