Search Results
Showing 1 - 10 of 100 results
Search Results
Technical report on material selection and processing guidelines for BWR coolant pressure boundary piping
| Location | Call # | Status |
|---|---|---|
| Joyner - Microforms B300 | Y 3.N 88:10/0313 | ✔ Available |
Interim technical report on BWR feedwater and control rod drive return line nozzle cracking
| Location | Call # | Status |
|---|---|---|
| Joyner - Microforms B300 | Y 3.N 88:10/0312 | ✔ Available |
Technical report on material selection and processing guidelines for BWR coolant pressure boundary piping
| Location | Call # | Status |
|---|---|---|
| Joyner - Microforms B300 | Y 3.N 88:10/0313/REV.2/FINAL | ✔ Available |
La Crosse boiling water reactor project
| Location | Call # | Status |
|---|---|---|
| Joyner - Fed Docs Stacks | Y 4.AT 7/2:L 11/4 | ✔ Available |
Standard technical specifications for General Electric boiling water reactors (BWR/5).
| Location | Call # | Status |
|---|---|---|
| Joyner - Fed Docs Stacks | Y 3.N 88:10/0123/REV.3 | ✔ Available |
Technical report on material selection and processing guidelines for BWR coolant pressure boundary piping
| Location | Call # | Status |
|---|---|---|
| Joyner - Fed Docs Stacks | Y 3.N 88:10/0313/REV.1/980 | ✔ Available |