Search Results
Showing 1 - 10 of 112 results
Search Results
Technical report on material selection and processing guidelines for BWR coolant pressure boundary piping
| Location | Call # | Status |
|---|---|---|
| Joyner - Fed Docs Stacks | Y 3.N 88:10/0313/REV.1 | ✔ Available |
Safety evaluation report on Westinghouse Electric Company ECCS evaluation model for plants equipped with upper head injection
| Location | Call # | Status |
|---|---|---|
| Joyner - Fed Docs Stacks | Y 3.N 88:10/0297 | ✔ Available |
Technical report on material selection and processing guidelines for BWR coolant pressure boundary piping
| Location | Call # | Status |
|---|---|---|
| Joyner - Microforms B300 | Y 3.N 88:10/0313/REV.2 | ✔ Available |