Search Results
Showing 1 - 10 of 21 results
Search Results
Monitoring of soil-structure interaction
| Location | Call # | Status |
|---|---|---|
| Joyner - General Stacks | TA711.5 .L39 1998 | ✔ Available |
Standard practice for direct design of buried precast concrete pipe using standards installation (SIDD)
| Location | Call # | Status |
|---|---|---|
| Joyner - General Stacks | TA447 .A53 1994 | ✔ Available |